宝丽来验厂-制程控制

编辑:admin 来源:上海励奥 日期: 2014-9-15 17:41:08

Process Control Polaroid/宝丽来验厂制程控制要求


1、Do the work instructions specify the materials to be used? (e.g., part number/name, assembly tools, inspection tools)
   制程作业规范是否对使用的物料做了明确定义(如:料物料名称、组装作业用具、检验用具等)


2、Do the work inspections indicate assembly specifications and machine setting? (e.g., solder temp, torque driver setting, and adjustment/test specifications)
   组装作业规范是否对组装作业说明和设备性能、参数作了明确说明?(焊接温度、工具扭矩设定、调整及测试规范等)


3、Are there work instructions defining the manner of production and installation for each process/station?
   制程作业规范是否对每一流程和工位的生产方式都作了明确的定义?


4、Do the work instructions clearly the machines, equipment, tools, fixtures, and program to be used?
   制程作业规范是否对使用的机器设备、模制具、备品、程序做明确的说明?


5、Are quality documents (e.g., QC-flow/work instructions) revision controlled and approved by authorized personnel prior to issue?
   品质文件(如:QC流程图及作业规范)的版本是否在发行前都经过授权人员的认证和承认?


6、Is there the SPC training program?
   是否有SPC的培训计划?


7、Is there the SPC training plan documented?
   SPC的培训计划是否有文件记录?


8、Have all relevant employees been trained according to the SPC training plan?
   所有相关人员是否依据SPC培训计划做了培训?


9、Does the SPC training program include control chart theory and process capability analysis skills?
   SPC培训计划是否包含控制流程图和流程功能分析技巧?


10、Are SPC training records for each employee maintained?
   对每位经过SPC培训的员工是否都有存档?

 

11、Are out-of-control conditions noted on control charts, with causes investigated, and actions provided?
   超出控制范围的状况是否依据调查原因及采取对策都在控制流程中备注?


12、Are appropriate action taken when the Cp/Cpk values are not meeting expectation
   当CP/CPK值如果为能达到期望值时是否采取适当的改进措施?


13、Are all critical processes and parameters under statistical control? (e.g., control chart, Cp/Cpk study)
   所有关键制程和参数是否都在统计控制之下?(如:控制流程图、CP/CPK)


14、Are upper and lower limits used on control charts
   上下限度是否在控制流程图中?


15、When a process goes out-of-control and produces nonconforming product, are triggers defined and documented for the purpose of initiating a stop build, or stop shipment action?
   当流程失控而造成产出不良品时,是否有规范来限定生产和出货的进行?

 

16、Are requirements for preventive maintenance defined and documented for activities that can influence the product quality?
   是否有针对影响产品品质作业的预防措施及文件记录?


17、Are records of these activities maintained?
    是否对各项作业记录都有所保存?

 

 

上海励奥质量技术服务有限公司
地址:上海市青浦区沪青平公路2799弄8号1楼          
点击这里给我发消息
公司总部:
电话: 021-36529816
    400-889-7855

江苏分公司:彭经理
手机:17301850331
扬州/镇江地区:刘经理
手机:13524551252
山东/华北地区:杨经理
手机:17721138411
南通/常熟办事处:李经理
手机:18958097503
温州/金华办事处:何经理
手机:13671618321
合肥办事处:杨经理
手机:17721138411
宁波/绍兴办事处:吴经理
手机:13524968276
华南地区:吴经理
手机:13524968276
Email:
网站首页 | 关于我们 | 成功案例 | 法律声明 | 联系我们 | 行业动态
地址:上海市青浦区沪青平公路2799弄8号1楼    联系电话:400-889-7855、+86 021-36529816
Copyright 2016 www.leocorp.com.cn,All Rights Reserved. ICP08111441号-1